Aerial view of an industrial area with halls, loading areas and green margins. Symbolic image, AI-generated

Industry

Low-cost process heat for industry

With process heat from biomass you lower your energy costs and become more independent of the energy markets.

Starting point

Plannable process heat relieves your balance sheet

Fossil heat ties capital to volatile markets. Plannable heat from biomass relieves the balance sheet.

Pyrolysis delivers hot water or low-pressure steam plus biochar and CO₂ certificates as two revenue streams. Terratec markets biochar and CO₂ certificates for you, which makes the project viable for investors and operators.

Fossil heat on volatile markets

Reliable heat for the process

A second value product from the same plant

In figures

What a plant delivers

Biomacon plants, calculated at around 8,000 operating hours per year.

160 to 900 kW

Thermal output

Heat from biomass, available year-round.

145 to 815 t/a

Biochar

Output per plant and year.

390 to 2,200 t CO₂/a

CO₂ certificates

1 t of biochar binds around 2.7 t of CO₂ equivalent.

Benefits

Process heat and independence for industrial operations

Cost, model, independence.

Process heat

Heat from biomass at calculable costs.

Contracting or direct purchase

Both are possible, depending on balance sheet and risk appetite.

Independence

Less dependence on fossil prices and energy markets.

Biomass delivery in the DACH region

No biomass of your own?

Our supplier network covers the DACH region. Internationally we source the biomass individually and develop delivery concepts cooperatively.

  • Regional supplier network
  • Suitable biomass and volumes
  • Delivery and supply planned with you

Models

Contracting or direct purchase

Two paths, both with the same benefit. You choose based on your balance sheet and risk appetite.

Contracting

A partner plans, builds and operates the plant. You buy the heat at a fixed price. No capital expenditure, no operating risk on your side.

Direct purchase

You invest yourself and operate the plant. Heat, biochar and certificates remain entirely with you. We include the funding in the calculation.

Businesses with their own residues supply the fuel themselves. Details are under Businesses with residual biomass.

Process

From first meeting to operation

  1. 01

    Preliminary assessment: clarify site, demand and permitting status.

  2. 02

    Site and biomass: define volumes, moisture and supply.

  3. 03

    Concept and profitability: calculate sizing, revenue and funding.

  4. 04

    Construction and commissioning: installation, connection and handover.

  5. 05

    Operation and marketing: use the heat, monetize carbon and certificates.

Practice and partners

Technology from established manufacturers

We work manufacturer-independent, among others with Biomacon.

The integrated systems run in continuous industrial operation. We are happy to invite you to tour a running plant.

Plant tours →

Practice

Plant tours on site

Tour a carbonization plant in operation. You speak with operators and see the technology in daily use.

Request a quote
Industrial hall in operation. Symbolic image, AI-generated.

FAQ

Frequently asked questions

Do we need our own residues? +

No. Through our regional supplier network we deliver suitable biomass and plan the supply with you.

Buy or contract? +

Both are possible. Direct purchase or contracting, depending on balance sheet and risk appetite.

Which residues are suitable? +

Dry production residues and woody biomass with a sufficient carbon content. We check suitability in the preliminary assessment.

How independent are we of energy markets? +

The heat comes from biomass. This reduces dependence on fossil prices.

What does the preliminary assessment cost? +

The preliminary assessment is our entry product. Details are on the offer page.

Next step

Review process heat for your operation

Tell us your material flows, heat demand and balance sheet framework. We check feasibility for your location.

You will receive a non-binding response within 24 hours.